In December 2017, MDN told you about a second proposed natural gas-fired power plant planned by CME Energy for Oregon (Lucas County), Ohio (see Ohio Approves 2nd Oregon Utica-Fired Elec Plant (Near Toledo)). The first plant was called the Oregon Clean Energy Center. The second plant project was named Clean Energy Future – Oregon. The…
The post Ohio Extends Time to Build 2nd Utica-Fired Elec Plant Near Toledo first appeared on Marcellus Drilling News. This post appeared first on Marcellus Drilling News.