SC PSC Approves Gas-Fired Power Plant Proposed for Edisto River

On Feb. 15, members of the South Carolina Public Service Commission approved a proposed project to build a 1,020-megawatt (MV) gas-fired power plant in the state’s Lowcountry, in Colleton County. The project is a 50/50 partnership between Dominion Energy (formerly South Carolina Electric & Gas) and Santee Cooper (South Carolina’s state-owned electric and water utility)….

The post SC PSC Approves Gas-Fired Power Plant Proposed for Edisto River first appeared on Marcellus Drilling News. This post appeared first on Marcellus Drilling News.