In March 2019 MDN brought you the news that Wood Group had been awarded a $34 million contract to build 28 miles of the 60-mile Risberg Pipeline from Crawford County, PA to Ashtabula County, OH (see Wood Wins $34M Contract to Build PA to OH Risberg Pipeline). The portion Wood built was new “greenfield” pipeline. The rest of the pipeline (32 miles) already existed and was repurposed. There is a controversy between Wood and RH energytrans (the owner) concerning payment, so Wood is going after the landowners whose property the pipeline traverses.
This post appeared first on Marcellus Drilling News.