ONGC’s M Field represents the second phase of the larger 98/2 Block development project which is expected to reach peak production of 45,000 bbl/d and 10 MMcm/d. This post appeared first on Hart Energy.
ONGC’s M Field represents the second phase of the larger 98/2 Block development project which is expected to reach peak production of 45,000 bbl/d and 10 MMcm/d. This post appeared first on Hart Energy.