Targeted to begin production in 2026, MODEC’s contract would be for the fifth FPSO to produce oil from Exxon Mobil’s operated deepwater Stabroek Block. This post appeared first on Hart Energy.
Targeted to begin production in 2026, MODEC’s contract would be for the fifth FPSO to produce oil from Exxon Mobil’s operated deepwater Stabroek Block. This post appeared first on Hart Energy.