The decision is a setback for Enbridge, which has proposed building the $750-million tunnel to address concerns that Line 5 could spill into the Great Lakes. This post appeared first on Hart Energy.
The decision is a setback for Enbridge, which has proposed building the $750-million tunnel to address concerns that Line 5 could spill into the Great Lakes. This post appeared first on Hart Energy.