Michigan ordered the pipeline to shut down by May 2021, which Enbridge ignored, and the two sides are embroiled in a legal battle over Line 5’s fate. This post appeared first on Hart Energy.
Michigan ordered the pipeline to shut down by May 2021, which Enbridge ignored, and the two sides are embroiled in a legal battle over Line 5’s fate. This post appeared first on Hart Energy.