The finalized build of Ørsted’s unscrewed surface vessels, which Maxwell Marine has been contracted to design and supply a technical anchoring system for, will be launched in late 2023. This post appeared first on Hart Energy.
The finalized build of Ørsted’s unscrewed surface vessels, which Maxwell Marine has been contracted to design and supply a technical anchoring system for, will be launched in late 2023. This post appeared first on Hart Energy.