The 0.8 Bcf/d Cove Point LNG facility has resumed operations, according to the project’s operator Berkshire Hathaway Energy. This post appeared first on Hart Energy.
The 0.8 Bcf/d Cove Point LNG facility has resumed operations, according to the project’s operator Berkshire Hathaway Energy. This post appeared first on Hart Energy.