Tellurian Inc., which is developing the 27.6 mtpa Driftwood LNG project south of Lake Charles, produced an average of 225 MMcf/d in fourth-quarter 2022 and expects production to remain flat in 2023. This post appeared first on Hart Energy.
Tellurian Inc., which is developing the 27.6 mtpa Driftwood LNG project south of Lake Charles, produced an average of 225 MMcf/d in fourth-quarter 2022 and expects production to remain flat in 2023. This post appeared first on Hart Energy.